A Shuffled Frog-Leaping Algorithm for Optimal Software Project Planning.
No Thumbnail Available
Date
2014
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
African Journal of Computing & ICTs
Abstract
In recent time, software project management has received considerable attention from researchers in the field of Search Based Software Engineering (SBSE). This paper presents an approach to Search Based Software Project Planning based on Shuffled Frog-Leaping Algorithm (SFLA). Our approach seeks to optimize work package scheduling with a view to achieving early overall completion time. To evaluate the algorithm, it is tested on a set of randomly generated problems and it’s results are compared with those of Genetic Algorithm (GA). Results indicate that SFLA is significantly superior to GA.
Description
Keywords
Shuffled Frog-Leaping Algorithm,, work package,, Design structure matrix, software project planning,, Search Based Software Engineering,