Risk Factors Impacting Cost and Time Performance of Mechanical and Electrical Services Projects

dc.contributor.authorAmuda-Yusuf, Ganiyu
dc.contributor.authorAdebiyi, Ranti T.
dc.contributor.authorOlowa, Theophilus
dc.contributor.authorOlorunoje, Lukman
dc.contributor.authorIdris, Soliu
dc.date.accessioned2021-10-13T11:55:31Z
dc.date.available2021-10-13T11:55:31Z
dc.date.issued2017
dc.description.abstractMechanical and electrical (M&E) services project is complex in nature and involves a large number of specialist organisations entering the project life cycle at different stages with different lines of relationships, responsibilities and riskmanagement capabilities. Hence, a number of risk arises at the design and installation stages which results into poor cost and time performance in M&E services projects. This paper identified and rank the risk factors affecting cost and time performance of M&E services project. A total of 30 risk factors identified from preliminary investigations was adopted as basis for a questionnaire survey to industry practitioners in Nigeria. Mean response analysis was used to determinedthe probability and severity of the risk factors and risk impact scores was used to rank the relative importance of the risk factors. Analysis of variance (ANOVA) was used to investigate differences of opinions between respondents'. The study identified 23 risk factors (risk impact >3.5) impacting M&E service projects. Out of these risk factors, 7 has significant impact while the rest havemoderate impact. The 7 risk factors in order of their significance are: high foreign materials content, poorly prepared tender documemt, late involvment of M&E engineers,noninvolvement of specialist designers, government policy change, poor specification and poor coodination of design imputs. In addition,ANOVAresults showthat no significant difference exists amongthe professionals on these 7 risk factors.This suggests that the risk level of M&E services project is high.The identification and ranking of the risk factors has practical implication inM&Eservices project. The risk identification and ranking table is a good tool for assessment of risks related toM&Eservices at project inception. This will allow the client and contractor to understand the high risk areas in M&E services project and, where applicable, assign responsibility for those risks to theparty orparties best situated to control them.en_US
dc.identifier.citationAmuda-Yusuf G., Adebiyi Ranti Taibat, Olowa Theophilus, Olorunoje Lukman.O and Idris S. (2017): Risk Factors Impacting Cost and Time Performance of Mechanical and Electrical Services Projects, Proceedings of Environmental Design and Management International Conference, B.T Aluko, H.A. Odeyinka, A.O. Ilesanmi, B.A. Ademuleya & O.P. Daramola (eds.), 428-438. Published by faculty of Environmental Design and Management, Obafemi Awolowo University, Ile-Ife, Nigeriaen_US
dc.identifier.urihttps://uilspace.unilorin.edu.ng/handle/20.500.12484/6625
dc.language.isoenen_US
dc.publisherFaculty of Environmental Design and Management, Obafemi Awolowo University, Ile-Ife.en_US
dc.subjectcost and time performanceen_US
dc.subjectmechanical and electrical servicesen_US
dc.subjectNigeriaen_US
dc.subjectpractitionersen_US
dc.subjectrisken_US
dc.titleRisk Factors Impacting Cost and Time Performance of Mechanical and Electrical Services Projectsen_US
dc.typeArticleen_US

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
RISK FACTORS IMPACTING COST AND TIME PERFORMANCE.pdf
Size:
302.04 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections