Effects of Detection Threshold and Frame Size On Duty Cycle in GSM Bands

dc.contributor.authorSikiru, Ismaeel Abiodun
dc.contributor.authorFaruk, N.
dc.contributor.authorPopoola, S. I.
dc.contributor.authorImam-Fulani, Yusuf Olayinka
dc.contributor.authorOloyede, A. A.
dc.contributor.authorOlawoyin, L. A.
dc.contributor.authorSurajudeen-Bakinde, N. T.
dc.date.accessioned2023-06-13T12:26:21Z
dc.date.available2023-06-13T12:26:21Z
dc.date.issued2017-11
dc.description.abstractExplosion in the demand for mobile applications those obtained based on actual measurements of the noise floor overestimates the occupancy values across all bands while the GSM 900 and 1800 MHz bands in Ilorin, Nigeria to cover a though, the International Telecommunication Union (ITU)has are examined.Spectrum measurements were conducted in the optimum prediction, 5dB above the measured average noise level should be considered as detection threshold. Furthermore, it was ITU 10 dB was found to be too conservative. Therefore, for and services necessitates the efficient utilization of the limited acceptable threshold value. In this paper, the effects of energy detection threshold techniques on duty cycle in the GSM bands provided a benchmark of 10dB above the noise level as an found that the number of frames of the sensing data do not have analytical method of determining noise level (theoretical) and most appropriate threshold value is not yet clearly stated, bandwidth of 105 MHz. Experimental results based on radio spectrum. Determination of a suitable detection threshold the probability of false alarm or failure detection. However, the Inappropriate choice of the threshold value may either increase is an important aspect of spectrum occupancy measurement. (measured) were analyzed. Findings indicated that the MaxNoise significant effect on the duty cycleen_US
dc.identifier.otherDOI: 10.1109/NIGERCON2017.8281905
dc.identifier.urihttps://uilspace.unilorin.edu.ng/handle/20.500.12484/11164
dc.language.isoenen_US
dc.publisher2017 IEEE 3rd International Conference on Electro-Technology for National Development (NIGERCON)en_US
dc.subjectthreshold, duty cycle, spectrum occupancy, GSMen_US
dc.titleEffects of Detection Threshold and Frame Size On Duty Cycle in GSM Bandsen_US
dc.typeOtheren_US

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
8_ECP_EffectsofDTandFSonDCbands.pdf
Size:
362.17 KB
Format:
Adobe Portable Document Format
Description:
Main article
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections